Study Team
A Town of Longmeadow staff team was convened in 2008 to develop a capital plan for the water and sewer systems and to explore water and sewer rate options. The staff team was comprised of:
- Town Manager Robin Crosbie
- Director of Administration and Finance Paul Pasterczyk
- Director of Public Works Mike Wrabel
- Assistant Director of Public Works for Water and Sewer Operations Pete Thurber
- Town Engineer Thom Martens
The team prepared a report that was presented to the Select Board in January 2009 and presented the findings at a public forum in February 2009.
Reports
View or download the
Water and Sewer Rate Options Presentation from February 11, 2009 (PDF). This does not constitute the full report, however. For the full report, see
Water and Sewer Rate Options (PDF).