How long will the feasibility study take
The in depth analysis of the current condition of the school as outlined in response to Question 1 above will take approximately 6-9 months. Upon completion of the first phase, the SBC, OPM and Designer Architect will work with the MSBA on determining the long term solution for the high school. The second phase of the study will include the conceptual and schematic designs and drawings for the solution selected and will take an additional 6 to 12 months.