Wasn’t there a study done on the high school a few years back?
Yes, a building study was completed by Kaestle Boos in 2004. This study provided
Longmeadow with the critical information needed to draft the Statement of Interest that was submitted to the MSBA in 2007.

The Statement of Interest was the driving reason for our selection by the MSBA. However, the feasibility study required by the MSBA will be much more comprehensive and include conceptual and schematic designs and drawings.

Show All Answers

1. What is a feasibility study?
2. Who conducts the feasibility study?
3. What is the difference between an Owner’s Project Manager (OPM) and Designer Architect?
4. How long will the feasibility study take
5. Wasn’t there a study done on the high school a few years back?
6. How much will the feasibility study cost?
7. How will the town pay for the study?
8. What is the financial impact of the debt exclusion for the high school?
9. What if the debt exclusion fails and the town votes down the monies?